Project Details

Sector: Commercial
Client:  Lancaster Maloney
Works: Removal of asbestos insulation residue and debris to walls, ceiling, floor & pipework in boiler room

Project Description

We completed some asbestos removal works at St Luke’s RC Primary School in Salford which took place August 2018. The school was planning to have a new boiler fitted and discovered some asbestos in the boiler room that had to be addressed before the works could take place.
The asbestos in question was insulation residue’s from old pipework that was once present within the boiler room. LAS operatives cleaned the asbestos residue and encapsulate the effected areas to ensure all were sealed.

The whole project took place under a full asbestos enclosure with negative pressure and air extraction equipment. We completed the project in the school summer shutdown.